Turkmenistan Cold Storage Base Project | ZHAOXUE Refrigeration

Let's Discuss Your Needs

Every great collaboration starts with a friendly chat.
We're here to help you figure things out and find the best way forward.
Company Name
Name
Email
WhatsApp
Mobile
Turkmenistan Cold Storage Base Project | ZHAOXUE Refrigeration

Projects

Home >  Projects

Turkmenistan

A flagship industrial base integrating intelligent storage, high-efficiency sorting, and deep processing for modern food supply chains.

Project Overview
Location
Ashgabat, Turkmenistan
Total Scale
Approximately 10,000㎡
  • Turkmenistan
  • Turkmenistan
  • Turkmenistan
  • Turkmenistan
Project Background
This project is a national-level, large-scale, and efficient food supply chain cold storage solution, demanding exceptionally high refrigeration performance and system stability.
Our Solutions

We have divided the entire base into three main functional areas for collaborative operations and efficient management.

1. Intelligent Cold Chain Storage & Sorting Center

  • High-Speed Sorting Hub: Equipped with 4 independent sorting lines serving two sorting areas with a total area exceeding 2,300㎡
  • Daily Processing Capacity: Hundreds of tons, meeting high-turnover demands of e-commerce and retail channels

2. Precision Multi-Temperature Zone Storage System

Designed with 7 different temperature zones, including:

  • Precision Temperature-Controlled Rooms: Specially designed for sensitive fruits and vegetables like bananas at +13°C
  • General Cold Storage Rooms: -2/+14°C
  • Freezing Rooms: -25°C
  • Quick-Freezing Rooms: -35°C
  • High-Temperature Rooms: +20°C

3. Deep Processing & High Value-Added Production Zone

  • Forming a closed-loop system from raw materials to high value-added finished products, achieving integrated industrial chain operations.
Technical Assurance
International Brand Components: Uses globally renowned brands such as Bitzer, Danfoss, Siemens, etc., with excellent performance and reliability under high-temperature conditions.
Project Progress
Overall Plan 5 phases in total, constructed in stages
Phase I Completed in 2024, currently operating very well</span >
Phase II Currently under construction, with our engineering team providing on-site installation guidance</span >
Partnership Both Phase I (2024) and Phase II (this year) installations were guided by our engineering team, demonstrating the trust of a long-term partnership. The new phase of the project is set to commence in 2026, and we look forward to more exciting developments.</span >